NIAB 1 (DARWIN GREEN 1): S/0247/14/DC

This application is for discharge of planning conditions relating to S/0001/07/F for Darwin Green 1, which approved the formation of vehicular, pedestrian and cycleway access road from Histon Road to serve the urban extension of the city between Huntingdon Road and Histon Road, Cambridge, together with drainage and landscaping Works.

The conditions this application relates to include:

  • Condition 3 - Hard and Soft Landscape Works
  • Condition 5 - Landscape Maintenance and Management Plan
  • Condition 7 - Scheme for the Provision and Implementation of Pollution Control of the Water Environment
  • Condition 8 - Ecological Management Plan
  • Condition 9 - Construction Management Plan
  • Condition 12 - Levels of Road and Associated Structures
  • Condition 13 - Soil and Contamination
  • Condition 14 - Archaeology
  • Condition 17 - Detailed Waste Management Plan

Condition 6 - Detailed Surface Water Drainage is a separate application ref. S/0204/14/DC.

The documents relating to the above details can be accessed here. Please ask us if you require these documents on CD-ROM.

Condition 3 - Hard and Soft Landscape Works

Covering letter [PDF, 0.2MB]

628.2-108 Rev D Attenuated Landscape Sheet 01 (of 02) A0 [PDF]

628.2-109 Rev E Attenuated Landscape Sheet 02 (of 02) A0 [PDF]

628.2-208 Rev C Attenuated Landscape PP Sheet 01 (of 02) A0 [PDF]

628.2-208 Rev C Attenuated Landscape PP Sheet 01 (of 02) A0 [PDF]

628.2-209 Rev D Attenuated Landscape PP Sheet 02 (of 02) A0 [PDF]

628.2-209 Rev D Attenuated Landscape PP Sheet 02 (of 02) A0 [PDF]

628.2-300-Rev F Typical Landscape Details [PDF]

Design Code Compliance Statement 140115 [PDF]

 

Condition 5 - Landscape Maintenance and Management Plan

628.2 RPT03 - Rev C - Landscape Management and Maintenance Plan (SCDC) binder [PDF]

 

Condition 7 - Scheme for the Provision and Implementation of Pollution Control of the Water Environment

B11005IDB - Condition 7 Pollution Control November 2013 [PDF, 61Kb]

 

Condition 8 - Ecological Management Plan

AEL0635_SCDC Ecological MP V3 0 20131023 [PDF]

 

Condition 9 - Construction Management Plan

DG SCDC Construction management plan December 2013 [PDF]

Appendix A Vehicle routes for major deliveries [PDF, 0.1MB]

Appendix B Traffic management plan TMP01 [PDF, 0.4MB]

Appendix C Examples of site specific safety board [PDF, 0.7MB]

Appendix D Drive in Drive out Wheel wash [PDF, 0.7MB]

Appendix E Construction Sign Pack [PDF, 1.5MB]

Appendix F Standard Site Compound [PDF, 1.5MB]

Appendix G The control of dust and emissions [PDF, 0.5MB]

Appendix H Risk assessment for mortar silos [PDF, 1MB]

Appendix I Light Pollution [PDF, 2.5MB]

Appendix J Health and Safety in construction [PDF, 0.1MB]

Appendix K Protecting The Public [PDF, 1.5MB]

Appendix L CC Code of Practice [PDF, 35Kb]

Appendix M Guidance for Mobile Crushing and Screening [PDF, 0.7MB]

Appendix N Detailed waste management plan [PDF, 2MB]

 

Condition 12 - Levels of Road and Associated Structures

B11129IDB-Condition 12 Road levels November 2013 [PDF, 5MB]

 

Condition 13 - Soil and Contamination

Main Site Investigation_Part 1 [PDF]

Main Site Investigation_Part 2 [PDF]

Main Site Investigation_Part 3 [PDF]

Main Site Investigation_Part 4 [PDF]

Main Site Investigation_Part 5 [PDF]

25459-02R(00) Supplementary Investigation [PDF]

25459-R03 (00) Summary Geo Environmental Report [PDF]

 

Condition 14 - Archaeology

Archaeology Albion PD 2012-57 version 1.3 [PDF, 1.5MB]

 Condition 17 - Detailed Waste Management Plan

Appendix N - Detailed waste management plan [PDF, 2MB]

  

Contact Details