Northstowe planning documents - Phase One
Phase 1 planning documents for the Northstowe development.
These documents include the full outline application for Phase 1 submitted in 2012 and any further reserved matters, amendments and documents received from Gallagher Estates.
You can view the relevant documents below:
- Phase 1 outline planning application S/0388/12/OL
- Document 1
- Document 2
- Document 3
- Document 4
- Document 5
- Document 6
- Document 7
- Document 8
- Document 9
- Document 10
- Document 11
- Document 12
- Document 13
- Document 14
- Document 15
- Document 16
- Document 17
- Document 18 volume 1
- Document 18 volume 2
- Phase 1 design code
- Phase 1 outline planning application S/0932/14/NM
- Reserved matters application
- Phase 1 outline planning application S/2232/16/NM
Phase 1 Northstowe Outline Planning Application - reference S/0388/12/OL
Outline Planning Application - Decision notice
Section 106 agreement - part one, part two, part three, part four, part five, part six, part seven, part eight, part nine
Document 1
- Application forms, certificates and notices. covering letter, site location plan and parameter plans
- Illustrative Master Plan
Document 2 - Existing site plans
- Existing Plans MainDevpt 1/11
- Existing Plans Maindevpt 2/11
- Existing Plans Maindevpt 3/11
- Existing Plans Maindevpt 4/11
- Existing Plans Maindevpt 5/11
- Existing Plans Maindevpt 6/11
- Existing Plans Maindevpt 7/11
- Existing Plans Maindevpt 8/11
- Existing Plans Maindevpt 9/11
- Existing Plans Maindevpt 10/11
- Existing Plans Maindevpt - 11/11
- Existing Plans attenponds 1/7
- Existing Plans attenponds 2/7
- Existing Plans attenponds 3/7
- Existing Plans attenponds 4/7
- Existing Plans attenponds 5/7
- Existing Plans attenponds 6/7
- Existing Plans attenponds 7/7
Document 3 - Design and Access Statement
- Introduction
- Section 1
- Section 2
- Section 3
- Section 4
- Section 5
- Section 6 (pt1)
- Section 6 (pt2)
- Section 7
- Section 8
- Section 9
Document 4 - Planning Supporting Statement
Document 5 -
- Local Centre Strategy and Retail Needs Assessment (incorporating Retail Capacity Assessment)
- Appendices 1-2
- Appendices 3-4
- Appendices 5-8
- Appendices 9
- Appendices 10-12
Document 6 -
Construction Management Strategy
Document 7 -
Strategic Utility Report (incorporating Foul Sewage Assessment)
Document 8 -
Document 9 -
Energy Statement (incorporating Renewable Energy Statement)
Document 10 -
Waste Management Strategy (incorporating Waste Design Guide Toolkit and Site Waste Management Plan)
Document 11 -
Document 12 - Tree Survey and Aboricultural Implications Assessment (24 docs)
- Tree Survey Main Report and Appendix 1
- Appendix 2 tcp primary 1
- Appendix 2 tcp primary 2
- Appendix 2 tcp primary 3
- Appendix 2 tcp primary 4
- Appendix 2 tcp primary 5
- Appendix 2 tcp primary 6
- Appendix 2 tcp primary 7
- Appendix 2 tcp primary 8
- Appendix 2 tcp primary 9
- Appendix 2 tcp primary 10
- Appendix 2 tcp primary 11
- Appendix 2 tcp primary 12
- Appendix 2 tcp primary 13
- Appendix 2 tcp primary overview 1-3 1
- Appendix 2 tcp primary 1-3 2
- Appendix 2 tcp primary 1-3 3
- Appendix 2 tcp primary 1-3 4
- Appendix 2 PrimaryLayouts 4-7
- Appendix 2 PrimaryLayouts 8-11
- Appendix 2_TCP Excavation
- Appendix 2_AIP Excavation
- Appendix 2 External plans
- Appendix 3,4,5,6
Document 13 -
Document 14 -
Document 15 -
Document 16 -
Summary of Supporting Information Document
Document 17 -
Environmental Statement Non-Technical Summary
Document 18 - Environmental Statement (ES) - Volume 1 Text
- ES Contents and Figures List
- ES Chapter 1 Introduction
- ES Chapter 2 Site description and development proposals
- ES Chapter 3 Environmental Issues and methodology
- ES Chapter 4 Landscape and visual
- ES Chapter 5 Cultural Heritage
- ES Chapter 6 Natural Heritage
- ES Chapter 7 Traffic and transport
- ES Chapter 8 Air quality
- ES Chapter 9 Noise and vibration
- ES Chapter 10 Geology hydrogeology contamination
- ES Chapter 11 Water resources flooding and drainage
- ES Chapter 12 Community economic and social
- ES Chapter 13 Agriculture_and_soil resources
- ES Chapter 14 Cumulative effects
- ES Chapter 15 Summary tables
- ES Volume 1 Glossary
Document 18 - Environmental Statement (ES) - Volume 2 Figures
- ES Vol 2 - Figures Introduction Chapter 1
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2 2.1
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2 2.2A
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2.2B
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.3
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2.4
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.5
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.6A
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.6B
- ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.6C
- ES Vol2 - Figures Site Desc and Dev Proposals Chapter 2_2.6D
- ES Vol2 - Figures Env'l Issues and Methodology Chapter 3
- ES Vol 2 - Figures Landscape and Visual Chapter 4
- ES Vol 2 - Figures Cultural Heritage Chapter 5
- ES Vol 2 - Figures Natural Heritage Chapter 6
- ES Vol 2 - Figures Traffic and Transport Chapter 7 7.1
- ES Vol 2 - Traffic and Transport 7_7.2
- ES Vol 2 - Traffic and Transport 7_7.3
- ES Vol 2 - Figures Air Quality Chapter 8
- ES Vol 2 - Figures Noise and Vibration Chapter 9
- ES Vol 2 - Figures Geology Hydro and Contamination Chapter 10
- ES Vol 2 - Figures Water Resources Flooding and Drainage Chapter 11
- ES Vol 2 - Figures Community Economic and Social Chapter 12
- ES Vol 2 - Figures Agriculture and Soil Chapter 13
- ES Vol 2 - Figures Cumulative Effects Chapter 14
- ES Vol 2 - Figures _1
- ES Vol 2 - Figures 2
- ES Vol - Figures _3A
- ES Vol - Figures _3B
- ES Vol - Figures _4
- ES Vol 2 - Figures _5
- ES Vol 2 _6
- ES Vol 2 - Figures_- Figures List
Document 18 Environmental Statement (ES) Technical Appendices
- ES Tech Appx A
- ES Tech Appx Ai
- ES Tech Appx Aii
- ES Tech Appx Aiii
- ES Tech Appx B - Aerial Photo Report
- ES Tech Appx B - Contents Page
- ES Tech Appx B - Desktop Addendum
- ES Tech Appx B - Desktop - Report 2002
- ES Tech Appx B - Evaluation 1 2004 part 1
- ES Tech Appx B - Evaluation 1 2004 part 2
- ES Tech Appx B - Evaluation 1 2004 part 3
- ES Tech Appx B - Evaluation 1 2004 part 4
- ES Tech Appx B - Evaluation 1 2004 part 5
- ES Tech Appx B - Evaluation 1 2004 part 6
- ES Tech Appx B - Evaluation report 2 part 1
- ES Tech Appx B - Evaluation report 2
- ES Tech Appx B - Geophysical survey
- ES Tech Appx B - Golf course geophysical survey part 1
- ES Tech Appx B - Golf_course_geophysical survey part 2
- ES Tech Appx B - Golf - course - geophysical survey part 3
- ES Tech Appx B - Golf course geophysical survey part 4
- ES Tech Appx B Golf course geophysical survey part 5
- ES Tech Appx B Golf course geophysical survey part 6
- ES Tech Appx B RAF History Part 1
- ES Tech Appx B RAF History Part 2
- ES Tech Appx B RAF History Part 3
- ES Tech Appx B RAF History Part 4
- ES Tech Appx B RAF History Part 5
- ES Tech Appx B Watching Brief
- ES Tech Appx B Gazetteer
- ES Tech Appx B WSI by CAU
- ES Tech Appx C Contents
- ES Tech Appx C Bat Survey
- ES Tech Appx C Butterfly Survey
- ES Tech Appx C Designated Sites
- ES Tech Appx C GCN Bird Survey
- ES Tech Appx C GCN Bird Survey Hattons Road
- ES Tech Appx C Invertebrate Survey
- ES Tech Appx C Moth Survey
- ES - Tech Appx C Reptile Survey
- ES Tech Appx C TOR WSP Survey
- ES Tech Appx D Transport Assessment Text
- ES Tech Appx D Transport Assessment Figs 1-8
- ES Appx D Transport Assessment Figs 9-15
- ES Tech Appx D Transport Assessment Appx A Pt 1
- ES Tech Appx D Transport Assessment Appx A Pt 2
- EA Tech Appx D Transport Assessment Appx B to F
- ES Tech Appx D Transport Assessment Appx G to L
- Tech Appx D Residential travel plans text
- Tech Appx D Residential travel plans figures 1 - 3
- Tech Appx D Residential travel plans figures 4 - 6
- Tech Appx D School Travel Plans Figures 1 & 2
- Tech Appx D School Travel Plans Figures 3 & 4
- Tech Appx D Workplace travel plans text
- Phase 1 Tech Appx Workplace Figures 1-3
- Tech Appx D Workplace travel plans figures 4-6 and appendices
- ES Tech Appx E
- ES Tech Appx F
- ES Tech Appx G1 Factual Report Part 1
- ES Tech Appx G1 Factual Report Part 2
- ES Tech Appx G1 Factual Report Part 3
- ES Tech Appx G1 Factual Report Part 4
- ES Tech Appx G1 Factual Report Part 5
- ES Tech Appx G1 Factual Report Part 6
- ES Tech Appx G1 Factual Report Part 7
- ES Tech Appx G1 Factual Report Part 8
- ES Tech Appx G1 Factual Report part 9
- ES Tech Appx H Flood Risk Assessment Text
- ES Tech Appx H Flood Risk Assessment Appx A to C
- ES Tech Appx H Flood Risk Assessment Appx D to F
- ES Tech Appx H Flood Risk Assessment Appx K
- ES Tech Appx H Flood Risk Assessment Appx G to J
- ES Tech Appx H Flood Risk Assessment Appx L to N
- ES Tech Appx I part 1
- ES Tech Appx I part 2
- ES Tech Appx I part 3
- ES Tech Appx I part 4
- ES Tech Appx I part 5
- ES Tech Appx J
Phase 1 Design Code April 2014
- Part 1 of the design code
- Part 2a of the design code
- Part 2b of the design code
- Part 3a of the design code
- Part 3b of the design code
- Part 4a of the design code
- Part 4b of the design code
Phase 1 Northstowe Outline Planning Application Non Material Amendment - reference S/0932/14/NM (APPROVED)
- Planning statement
- Density plan
- Ecological mitigation strategy: primary development site
- Building heights plan
- Land use, open space & landscape
- Movement and access
- Tree retention & removal plan
Reserved Matters Application for Hatton's Road Ponds - reference S/0038/15/RM (APPROVED)
- Planning Statement
- South Pond General Arrangement Landscape
- North Pond General Arrangement Landscape
- Ponds/Agricultural access
- South Pond General Arrangement
- North Pond General Arrangement
- Proposed Southern Pond Maintenance Access
- Proposed Farm and Northern Pond Maintenance Access
- Site Location Plan
Reserved Matters Application for the Local Centre Square - reference S/3164/15/RM (APPROVED)
- Planning Statement
- Planting Palette
- Materials Palette
- Tree pit in soft landscape
- Tree pit in paving
- Fountain detail
- Typical hard details
- Lighting design
- Shrub planting
- Tree planting
- Tree planting plan
- Site location
- Detailed design
Phase 1 Outline Planning Application Non Material Amendment - reference S/2232/16/NM (APPROVED)
Contact Details
Was this web page helpful?
Tweets by @SouthCambs
By clicking 'consent' you agree to view our Twitter feed embedded in our website.
Twitter will set cookies on your device which you can delete in your browser settings.
Read more about how we use cookies.