Northstowe planning documents Phase One

On this page you will find all Phase 1 planning documents for the Northstowe development. These documents include the full outline application for Phase 1 submitted in 2012 and any further reserved matters, amendments and documents received from Gallagher Estates. Please click on the links below to jump to the relevant documents in the page:

Phase 1 Outline Planning Application - reference S/0388/12/OL

Outline Planning Application - Decision notice
Section 106 agreement - part one, part two, part three, part four, part five, part six, part seven, part eight, part nine

Document 1

- Application forms, certificates and notices. covering letter, site location plan and parameter plans - Illustrative Master Plan

Document 2 - Existing site plans

Existing Plans MainDevpt 1/11 - Existing Plans Maindevpt 2/11 - Existing Plans Maindevpt 3/11 - Existing Plans Maindevpt 4/11 -  Existing Plans Maindevpt 5/11 - Existing Plans Maindevpt 6/11 - Existing Plans Maindevpt 7/11 - Existing Plans Maindevpt 8/11 - Existing Plans Maindevpt 9/11 - Existing Plans Maindevpt 10/11 - Existing Plans Maindevpt - 11/11 - Existing Plans attenponds 1/7 - Existing Plans attenponds 2/7 - Existing Plans attenponds 3/7 - Existing Plans attenponds 4/7 - Existing Plans attenponds 5/7 - Existing Plans attenponds 6/7 - Existing Plans attenponds 7/7

Document 3 - Design and Access Statement

Introduction - Section 1 - Section 2 - Section 3 - Section 4 - Section 5 - Section 6 (pt1) - Section 6 (pt2) - Section 7 - Section 8 - Section 9

Document 4 - Planning Supporting Statement

Sections 1-3 - Section 4 (pt1) - Section 4 (pt2) - Section 4 (pt3) - Section 5-7 - Appendices

Document 5 -

Local Centre Strategy and Retail Needs Assessment (incorporating Retail Capacity Assessment) Appendices 1-2 - Appendices 3-4 - Appendices 5-8 - Appendices 9 - Appendices 10-12

Document 6 - 

Construction Management Strategy

Document 7 - 

Strategic Utility Report (incorporating Foul Sewage Assessment)

Document 8 -

Health Impact Assessment

Document 9 -

Energy Statement (incorporating Renewable Energy Statement)

Document 10 -

Waste Management Strategy (incorporating Waste Design Guide Toolkit and Site Waste Management Plan)

Document 11 -

Sustainability Statement

Document 12 - Tree Survey and Aboricultural Implications Assessment (24 docs)

Tree Survey Main Report and Appendix 1 - Appendix 2 tcp primary 1 - Appendix 2 tcp primary 2 - Appendix 2 tcp primary 3 - Appendix 2 tcp primary 4 - Appendix 2 tcp primary 5 - Appendix 2 tcp primary 6 - Appendix 2 tcp primary 7 -  Appendix 2 tcp primary 8 - Appendix 2 tcp primary 9 - Appendix 2 tcp primary 10 - Appendix 2 tcp primary 11 - Appendix 2 tcp primary 12 - Appendix 2 tcp primary 13 - Appendix 2 tcp primary overview 1-3 1 - Appendix 2 tcp primary 1-3 2 - Appendix 2 tcp primary 1-3 3 - Appendix 2 tcp primary 1-3 4 - Appendix 2 PrimaryLayouts 4-7 - Appendix 2 PrimaryLayouts 8-11 - Appendix 2_TCP Excavation - Appendix 2_AIP Excavation - Appendix 2 External plans - Appendix 3,4,5,6

Document 13 -

Water Conservation Strategy

Document 14 -

Low Emissions Strategy

Document 15 -

 Statement of Consultation

Document 16 -

Summary of Supporting Information Document

Document 17 -

Environmental Statement Non-Technical Summary

Document 18 - Environmental Statement (ES) - Volume 1 Text

ES Contents and Figures List - ES Chapter 1 Introduction - ES Chapter 2 Site description and development proposals - ES Chapter 3 Environmental Issues and methodology - ES Chapter 4 Landscape and visual - ES Chapter 5 Cultural Heritage - ES Chapter 6 Natural Heritage - ES Chapter 7 Traffic and transport - ES Chapter 8 Air quality - ES Chapter 9 Noise and vibration - ES Chapter 10 Geology hydrogeology contamination - ES Chapter 11 Water resources flooding and drainage - ES Chapter 12 Community economic and social - ES Chapter 13 Agriculture_and_soil resources - ES Chapter 14 Cumulative effects - ES Chapter 15 Summary tables - ES Volume 1 Glossary

Document 18 - Environmental Statement (ES) - Volume 2 Figures

ES Vol 2 - Figures Introduction Chapter 1 - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2 2.1 - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2 2.2A - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2.2B - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.3 - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2.4 - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.5 - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.6A - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.6B - ES Vol 2 - Figures Site Desc and Dev Proposals Chapter 2_2.6C - ES Vol2 - Figures Site Desc and Dev Proposals Chapter 2_2.6D - ES Vol2 - Figures Env'l Issues and Methodology Chapter 3 - ES Vol 2 - Figures Landscape and Visual Chapter 4 - ES Vol 2 - Figures Cultural Heritage Chapter 5 - ES Vol 2 - Figures Natural Heritage Chapter 6 - ES Vol 2 - Figures Traffic and Transport Chapter 7 7.1 - ES Vol 2 - Traffic and Transport 7_7.2 - ES Vol 2 - Traffic and Transport 7_7.3 - ES Vol 2 - Figures Air Quality Chapter 8 - ES Vol 2 - Figures Noise and Vibration Chapter 9 - ES Vol 2 - Figures Geology Hydro and Contamination Chapter 10 - ES Vol 2 - Figures Water Resources Flooding and Drainage Chapter 11 - ES Vol 2 - Figures Community Economic and Social Chapter 12 - ES Vol 2 - Figures Agriculture and Soil Chapter 13 - ES Vol 2 - Figures Cumulative Effects Chapter 14 - ES Vol 2 - Figures _1 - ES Vol 2 - Figures  2 - ES Vol - Figures _3A - ES Vol - Figures _3B - ES Vol - Figures _4 - ES Vol 2 - Figures _5 - ES Vol 2 _6 - ES Vol 2 - Figures_- Figures List

Document 18 Environmental Statement (ES) Technical Appendices

ES Tech Appx A - ES Tech Appx Ai - ES Tech Appx Aii - ES Tech Appx Aiii
ES Tech Appx B - Aerial Photo Report - ES Tech Appx B - Contents Page - ES Tech Appx B - Desktop Addendum - ES Tech Appx B - Desktop - Report 2002 - ES Tech Appx B - Evaluation 1 2004 part 1 - ES Tech Appx B - Evaluation 1 2004 part 2 - ES Tech Appx B - Evaluation 1 2004 part 3 - ES Tech Appx B - Evaluation 1 2004 part 4 - ES Tech Appx B - Evaluation 1 2004 part 5 - ES Tech Appx B - Evaluation 1 2004 part 6 - ES Tech Appx B - Evaluation report 2 part 1 - ES Tech Appx B - Evaluation report 2 - ES Tech Appx B - Geophysical survey - ES Tech Appx B - Golf course geophysical survey part 1 - ES Tech Appx B - Golf_course_geophysical survey part 2 - ES Tech Appx B - Golf - course - geophysical survey part 3 - ES Tech Appx B - Golf course geophysical survey part 4 - ES Tech Appx B Golf course geophysical survey part 5 - ES Tech Appx B Golf course geophysical survey part 6 - ES Tech Appx B RAF History Part 1 - ES Tech Appx B RAF History Part 2 - ES Tech Appx B RAF History Part 3 - ES Tech Appx B RAF History Part 4 - ES Tech Appx B RAF History Part 5 - ES Tech Appx B Watching Brief - ES Tech Appx B Gazetteer - ES Tech Appx B WSI by CAU
ES Tech Appx C Contents - ES Tech Appx C Bat Survey - ES Tech Appx C Butterfly Survey - ES Tech Appx C Designated Sites - ES Tech Appx C GCN Bird Survey - ES Tech Appx C GCN Bird Survey Hattons Road - ES Tech Appx C Invertebrate Survey - ES Tech Appx C Moth Survey - ES - Tech Appx C Reptile Survey - ES Tech Appx C TOR WSP Survey
ES Tech Appx D Transport Assessment Text - ES Tech Appx D Transport Assessment Figs 1-8 - ES Appx D Transport Assessment Figs 9-15 - ES Tech Appx D Transport Assessment Appx A Pt 1 - ES Tech Appx D Transport Assessment Appx A Pt 2 - EA Tech Appx D Transport Assessment Appx B to F - ES Tech Appx D Transport Assessment Appx G to L
Tech Appx D Residential travel plans text - Tech Appx D Residential travel plans figures 1 - 3 -  Tech Appx D Residential travel plans figures 4 - 6 - Tech Appx D School Travel Plans Figures 1 & 2 - Tech Appx D School Travel Plans Figures 3 & 4 - Tech Appx D Workplace travel plans text - Phase 1 Tech Appx Workplace Figures 1-3 - Tech Appx D Workplace travel plans figures 4-6 and appendices
ES Tech Appx E
ES Tech Appx F
ES Tech Appx G1 Factual Report Part 1
 - ES Tech Appx G1 Factual Report Part 2 - ES Tech Appx G1 Factual Report Part 3 - ES Tech Appx G1 Factual Report Part 4 - ES Tech Appx G1 Factual Report Part 5 - ES Tech Appx G1 Factual Report Part 6 - ES Tech Appx G1 Factual Report Part 7 - ES Tech Appx G1 Factual Report Part 8 - ES Tech Appx G1 Factual Report part 9
ES Tech Appx H Flood Risk Assessment Text - ES Tech Appx H Flood Risk Assessment Appx A to C - ES Tech Appx H Flood Risk Assessment Appx D to F - ES Tech Appx H Flood Risk Assessment Appx K - ES Tech Appx H Flood Risk Assessment Appx G to J - ES Tech Appx H Flood Risk Assessment Appx L to N
ES Tech Appx I part 1 - ES Tech Appx I part 2 - ES Tech Appx I part 3 - ES Tech Appx I part 4 - ES Tech Appx I part 5
ES Tech Appx J

 Phase 1 Design Code April 2014

Phase 1 Outline Planning Application Non Material Amendment - reference S/0932/14/NM (APPROVED)

Reserved Matters Application for Hatton's Road Ponds - reference S/0038/15/RM (APPROVED)

Reserved Matters Application for the Local Centre Square - reference S/3164/15/RM (APPROVED)

Phase 1 Outline Planning Application Non Material Amendment - reference S/2232/16/NM (APPROVED)

Non Material Amendment to Parameter Plans and SARW Northstowe Phase 2 S/2435/17/NM

You can find the plans and documents by visiting the planning portal

Contact Details

03450 450 500